COMPLIANCE REGISTER

Stage 1 · working prototype
⌕ Search the library
built by AIVY · anonymised showcase of a real client prototype
⚠ All data is synthetic - fabricated project "Foundry Lane" (CE-2026-0417) · no client data · extraction pre-computed for a stable demo
PROJECT
Every session, register and document hangs off the selected project.

Strategy session - the register is born

Engineers run the strategy discussion exactly as they do today. The AI reads the session and proposes a structured register - every item labelled AI inferred, pending human review. Nothing is decided by the AI.

Foundry Lane Warehouse Conversion · CE-2026-0417 · session recorded 22 May 2026 · D. Okafor (PD), P. Sharma (PM), T. Reeves (Engineer)
Bring the session in: simulated · Stage 1 intake
Stage 1 runs on the transcript you already produce. The approved capture door is agreed in the sprint, inside your Australian boundary.

Structured register

0 items · 0 performance solutions
AI inferred - pending human review
pre-computed demo run - same screen flow, no live call in the demo
Review 15 items →

PM review - humans own the judgement

Every item classified with the consultancy's own taxonomy and anchored to the transcript - click any timestamp to see the exact source line. Rows with incomplete evidence rise to the top and block the write until a human decides.

0
items
0
AI-classified
0
need a human decision
0
confirmed
0%
Item type · provenanceNCC ref DescriptionProposed strategy / action SourcePM ✓
0 of 15 reviewed
Confirm unlocks when the 3 “needs a human” rows are resolved.

(in production, writes to your monday.com board)
Open the register →

Performance Solutions Register - Project Director view

The single source of truth, seven weeks later (today, 14 Jul). Statuses moved as the project advanced through PBDB. Every change carries who, when and why - the record that today lives in heads, comments and email threads. The register supports the director's duty of review - it never replaces it.

Signature exposure - across your book (synthetic)

On a good day this screen shows nothing. 0 endorsements · 0 current · 0 standing on changed ground
ProjectPSSigned → nowOrigin of changeStage
Foundry Lane ConversionPS-004 9 m comparative → 14 m full evacuation brigade-directed FRV response · AI-proposed · engineer confirms PBDB → FER
Harbour Mill Redevelopment (sample)PS-011 smoke exhaust 5 ACH → 6 ACH proposed internal refinementFER drafting
Kensington Goods Depot (sample)PS-002 Type A assumption → Type B confirmed DtS reconciliationFSCS review
Caught 7 weeks before lodgement. Today a change like this surfaces in the director's final read, ~2 days before delivery - the rework scramble you described.
Generate the draft →
Stage 4 · roadmap preview

Documents - one approved change becomes a first draft

Turn one approved change into a first-draft document - in your Word format - with checks that flag unapproved number or clause changes. Always Word, always reviewable, never auto-issued.

✓ FSCS issued · 28 May
✓ PBDB v1 issued to FRV · 12 Jun
⚠ PBDB v2 - CHANGED brigade response · 08 Jul
● FER §7.4 drafting now
☐ FIR checklist auto-derived from the approved FER (Stage 5, coming)
Format profiles per brigade: FRNSW strict · FRV flexible (roadmap).
Input · provenance
Generating from:
PS Register entry - the approved change
PS-004 · Extended exit travel distance
9 m → 14 mcomparative RSET/ASET → full evacuation modelling
Review outcome recorded by D. Okafor · 13 Jul
PBDB v2 - brigade response, ingested as input
FRV response received 08 Jul: travel distance revised to 14 m; full evacuation modelling required. This is the document the engineering team reformats by hand today - PBDB in, FER language out.
The AI drafts only changes already approved in the register - it never invents an edit. ← the change the brigade forced, in the PS Register
Generate
The draft - native Word tracked changes Runs after Generate - the draft lands here as a real Word page.
The check - deterministic number check Runs automatically after every draft.
Find the precedent - search the library →
Stage 3 · design preview · sample data

⌕ Precedent Library - find the justification, not just the document

SharePoint and Copilot find you a document; this finds you a justification, and tells you whether the brigade recorded an objection.

PS category: smoke management building class: 5 / 6 / 9b brigade: FRV brigade: FRNSW NCC: 2019 + 2022 year: 2019–2026
Restricted sites are excluded - not searched, not counted.
Access follows your project permissions, granted site-by-site by your IT.
see how ▸
No generated answer in the query path - it returns source documents. Any tagging or embeddings run inside the approved AU boundary, on ISSUED reports only. Search quality is measured on your golden set before Stage 3 is billed.
Stage 6 · QA & review dashboard · design preview

▦ Overview - the whole book at a glance

The GM and directors' view: what was captured, what is waiting on a human, and what needs a director's attention - across every live project. In production this is your monday.com QA dashboard, fed by the register. Synthetic data.

MC M. Calder · General Manager · full visibility
Week of 14 Jul 2026 · mirrors to monday.com - simulated in this demo
312
Active projects
9
Strategy sessions captured this week
14
Items awaiting PM review
3
PS changes flagged to a director
6
Documents in draft
7
Registers written this week

Needs your attention

PS-004 · Foundry Lane - brigade-directed change, awaiting the director's review outcome.
flagged 08 Jul · D. Okafor notified
Foundry Lane - 3 items need a human decision before the register can be written.
P. Sharma (PM)
Harbour Mill Redevelopment - PS-011 internal refinement pending PD endorsement.
FER drafting
Kensington Goods Depot - FSCS review complete, no objection recorded.
on track

Live projects - status

ProjectStageOpen PSPending reviewsFlags
Foundry Lane ConversionPBDB → FER63● 1
Harbour Mill RedevelopmentFER drafting40● 1
Kensington Goods DepotFSCS review51-
Riverside Woolstore (VIC)PBDB → FRV30-
Collins Street PodiumFER issued70-
Showing 5 of 312 · one row per live project · click-through opens the project register in the live product.
Open a flagged project →
Synthetic demo · Word, monday and SharePoint stay · Engineers sign off · Production boundary agreed in the sprint
Claude on Amazon Bedrock, Australia inference profiles (processed in Australia)